In a third embodiment, a track connector system (122,124) is provided comprising at least three fasteners (122) each of which is in contact with the track (120) and adapted to be temporarily removed from the track to permit the suspended scaffolding system (100,350) to negotiate obstacles.ฤก. In a second embodiment a moveable counterweight (37,142) is provided on the suspended scaffolding system, adapted to be displaced from a first position (142a) to a second position (142b) to change the centre of gravity of the suspended scaffolding system. In a first embodiment, the connector system has connectors (118) that permit relative movement with respect to the track in two orthogonal planes. Disclosed is a suspended scaffolding system (100,350) including a connector system (32,33,112,118,218) adapted to engage a track (31,120) which in use is in contact with the surface of a structure (30), an arm (34, 39,114) connects the suspended scaffolding system to the connector system (32,33,112,118,218), so in use the suspended scaffolding system is suspended below the structure.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |